CE-Certified Factory·Machinery Directive 2006/42/EC·Guangzhou, China Verified Alibaba Gold Supplier · Engineer reply ≤ 4h · WhatsApp +86 134 3039 1618 ↗
TRANSMESUN logoTRANSMESUNMEISHUN AUTOMATIC TRANSMISSION
Home/Factory & QC/Stage 6: Independent Component Bench Testing
Valve body bench testing
Valve body and solenoid bench testing on the TRANSMESUN test line

Real on-site footage from the Huadu factory floor

Process Walkthrough · Stage 6 of 10

Independent Component Bench Testing

Stage 6 of the ten-stage TRANSMESUN remanufacturing process — the same procedure every unit follows at our Guangzhou Huadu factory, documented step by step.

CE-certified factoryIntertek assessed100% dyno tested12-month guarantee

Discuss Your Reman Program → WhatsApp Our Engineers

All ten stages
What happens in stage 6

Inside the stage.

Before anything is assembled into a unit, it proves itself alone. Solenoids, sensors and valve body assemblies are electronically and hydraulically bench-tested for oil circuit flow, pressure stability, switching response and leakage performance.

For all CVT units, we perform dedicated pulley cylinder pressure testing to eliminate internal micro-leakage, pressure loss and sealing failure — the faults that show up in the vehicle as slipping and delayed shifting.

A solenoid that passes on the car 'seems fine' until it overheats. Bench testing verifies each component against spec in isolation, so assembly starts only from parts that already perform.

Acceptance criteria

What this stage verifies.

Applied to every unit on the line — the same standard shown in our on-site videos and verified by the 2026 Intertek on-site assessment (report 481351002_P+T).

Solenoids: switching response and leakage Sensors: electrical verification Valve bodies: oil circuit flow and pressure stability Pressure deviation and leakage checked CVT pulley cylinder pressure test — every unit Micro-leakage and pressure loss eliminated
Stage 6 FAQ

Questions buyers ask about this stage.

Why test components before assembly instead of only testing the finished unit?

A component fault found at bench stage costs minutes; found at dyno stage it costs a teardown. Independent testing isolates faults before they are hidden inside an assembly.

What is CVT pulley cylinder pressure testing?

A dedicated test for every CVT unit that checks the pulley cylinders for internal micro-leakage, pressure loss and sealing failure — the root cause of slipping and delayed shifting.

What guarantee covers a unit rebuilt through this process?

Every remanufactured unit carries a 12-month quality guarantee. Ordering terms are verified in the 2026 Intertek on-site assessment: MOQ from 1 piece, lead time from 1 day for in-stock codes, and written fitment confirmation before dispatch.

See the full ten-stage process →

Order with confidence

Every unit follows all ten stages.

MOQ from 1 piece · lead time from 1 day for in-stock codes · 12-month quality guarantee · fitment confirmed in writing before dispatch. Send your transmission code or nameplate photo — engineer reply within 4 business hours.

Send Inquiry → WhatsApp +86 134 3039 1618